Tomorrow. I replace sill and toe plater on the wall that is completely stripped. Have to jack up the entire structure. Next comes tearing down the ceiling (always fun) and up the subfloor. Then hot mopping it with asphalt and covering with tar paper, add furring strips. Attach new subfloor. Install new drywall. Im not replacing the kitchen though cause... I dont really need it.
There is also another whole section the same size as this that needs to be stripped, but it is full of "stuff". Remember kids, smoke damage is not fun.
Total cost to date $34.58 in building supplies, $20 in dump stickers (removed 1 ton of drwall and misc cabinetry).
After:
Tomorrow. I replace sill and toe plater on the wall that is completely stripped. Have to jack up the entire structure. Next comes tearing down the ceiling (always fun) and up the subfloor. Then hot mopping it with asphalt and covering with tar paper, add furring strips. Attach new subfloor. Install new drywall. Im not replacing the kitchen though cause... I dont really need it.
There is also another whole section the same size as this that needs to be stripped, but it is full of "stuff". Remember kids, smoke damage is not fun.
Total cost to date $34.58 in building supplies, $20 in dump stickers (removed 1 ton of drwall and misc cabinetry).