I use this stuff:Anyone know what to use on garage doors to prevent them from squeaking? Its not the chain, its the rollers and the hinges on the door panels not having any bushings or anything.
Tried a dry film lube and it worked for a week and a half or so but I'm hoping to find something that lasts more than a couple months.
Graphite lubeAnyone know what to use on garage doors to prevent them from squeaking? Its not the chain, its the rollers and the hinges on the door panels not having any bushings or anything.
Tried a dry film lube and it worked for a week and a half or so but I'm hoping to find something that lasts more than a couple months.
Oh, and I put a set of these in:Anyone know what to use on garage doors to prevent them from squeaking? Its not the chain, its the rollers and the hinges on the door panels not having any bushings or anything.
Tried a dry film lube and it worked for a week and a half or so but I'm hoping to find something that lasts more than a couple months.
Not my house, not gonna buy shit anymoreOh, and I put a set of these in:
Amazon product ASIN B01N5IPY3Y
They did a lot to quiet the door down. I think the PO did basically no maintenance on the thing before he moved out.
peppers need 80-90 degree soil to reliably germinatePut some pepper seeds in a container in the little greenhouse we have.
Maybe they’ll do something
The rando lettuce that’s in it from last years bolted lettuce is doing nicely.
peppers need 80-90 degree soil to reliably germinate
Ugh, I need to go get ply for the attic soon. My car part hoarding has gotten out of hand, and I need to put up shelves along the load-bearing wall and get the plastic bins off the truss bottoms.Took everything outta the barn to sort and organize. Barn floor is way more rotted than I thought it was. My fault 10 years ago for not putting down vapor barrier, and for using osb. Just had pressure treated timbers on soil with the osb on top.
Luckily I've got 6 sheets of proper ply lying around I can swap in for the worst parts.
Got the garden all cleaned up, more weed mat down on areas that didn't have it, and relocated the compost bin closer to the gate so in theory it will be easier to get to and we'll actually use it.
This week gonna put together an A-Frame green house with leftover materials.